TeraWulf (NASDAQ: $WULF) 股價今日上漲10.34%,報25.05美元。公司Announced plans to develop a large‑scale artificial intelligence (A.I.) and high‑performance computing (HPC) data‑centre campus in Kentucky, named "Muskie Data Campus"。The acquired site can support over one gigawatt of A.I. and HPC infrastructure. Expected initial power capacity is 500 megawatts in the second half of 2028, with an additional 500 megawatts slated for completion by 2030. This initiative strengthens TeraWulf’s push into electricity and transmission infrastructure, which sits at the core of the current A.I. boom. As one of several Bitcoin (CRYPTO: $BTC) miners that have shifted toward A.I. data‑centre operations amid a slump in crypto prices, TeraWulf is positioning itself to capture the rapidly growing demand for compute power driven by A.I. models. The A.I. data‑centre sector is among the hottest segments of the equity market, as investors anticipate that the massive power requirements of A.I. workloads will generate long‑term, lucrative businesses. WULF stock has surged 536% over the past 12 months to reach $25.05 per share.
Key Takeaways
TeraWulf 股價在公告AI與HPC資料中心擴張計畫後上漲10.34%至25.05美元
Muskie Data Campus 預計2028年後半期提供首批500MW電力,2030年前再擴充 another 500MW